There was about 12 hours of digging on Tuesday evening and all day Wednesday... Bell tech was there bright and early Thursday morning. Install of the new cable, connections on the pole, running it through the wall of our house and setting up the new modem took the tech about 3 hours. After that it was time to play with tractors and backfill the trench... Two hours later it was all filled in and levelled out... Just a dry dusty brown stripe across the yard
A big thanks to @Eugen for selling me the loader, and helping out when I had some engine issues...
( that's next on the list of tractor things to do... )
