Re: Building a bigger toy box.

Posted: Sat Jan 18, 2025 9:47 am
by Wabasto
Good morning Eugene. Looks like you have been busy. That’s an understatement by a long shot. The shop is looking fantastic. You guys sure know what your doing.
Hopefully it’s going to be a short winter. The last few days have been a welcome change in the temperature. Keep up the good work. It looks absolutely fantastic. Have a good weekend. Paul

Re: Building a bigger toy box.

Posted: Fri Feb 07, 2025 3:26 pm
by Spike188
20250116_154846.jpg
3 south facing windows installed.
20250116_154903.jpg
followed by boxing in steel post and beams.
20250121_165710.jpg
Using the tarp from the temporary building,, the front was closed in. Steel cladding will not arrive until Feb 19.
20250123_171058.jpg
We opted to put vapor barrier on ceiling and strap for steel.
20250127_165314.jpg
Then insulate, vapor barrier, and strapping on sidewalls, after the electrical rough in.
20250129_172054.jpg
Most of a week 1/2 days spent by 2 of us.
20250205_113520.jpg
Overhead doors arrived as scheduled and were installed Wednesday.
20250205_164728.jpg
Our forklift was pulled across the tundra for its 1st night inside in 15 years.
20250205_165306.jpg
Even the pickup got a night indoors.
20250206_080157.jpg
The site is starting to look presentable.
20250206_150356.jpg
And the greatest moment of all, the 646 is in it's new home.

Re: Building a bigger toy box.

Posted: Fri Feb 07, 2025 5:30 pm
by DavidBarkey
Looking good Eugene . When does the roof and blown in insulation go in ?

Re: Building a bigger toy box.

Posted: Fri Feb 07, 2025 6:28 pm
by Harry
Amazing work Spike. Were all envious, at least I am! :cool: :peace: Harry

Re: Building a bigger toy box.

Posted: Fri Feb 07, 2025 7:31 pm
by MattA
Looks great Eugen. How big is the new toy box?

Re: Building a bigger toy box.

Posted: Fri Feb 07, 2025 9:58 pm
by Spike188
@DavidBarkey The exterior and interior cladding is scheduled to arrive on Tuesday, Feb 19. Weather permitting, 3 of us will finish the roof that week. Once the roof is finished, weather will dictate inside or outside cladding installation. Soffit and trim is going on next week.
@MattA 30 X 46 X 14 sidewalls. 2 overhead doors are 12 X 12.

Re: Building a bigger toy box.

Posted: Sat Feb 08, 2025 5:34 am
by DavidBarkey
Spike188 wrote: Fri Feb 07, 2025 9:58 pm @DavidBarkey The exterior and interior cladding is scheduled to arrive on Tuesday, Feb 19. Weather permitting, 3 of us will finish the roof that week. Once the roof is finished, weather will dictate inside or outside cladding installation. Soffit and trim is going on next week.
@MattA 30 X 46 X 14 sidewalls. 2 overhead doors are 12 X 12.
Awesome , I imagine you have waited a long time to have a shop like this . I love my warm little shop , but size does matter . So just a little envious . Hopefully the weather is nice enough you can get at least the roof on for now .

Re: Building a bigger toy box.

Posted: Sat Feb 22, 2025 10:03 pm
by Spike188
20250220_144150.jpg
The steel arrived Thursday as scheduled. Today, Saturday, Feb 22 was a Sunny day but still well below freezing. Not planning ahead during site prep ment several hours of extra seat time today.
20250222_124147.jpg
The fresh air makeup unit was stored as far from the build as anything.
20250222_124156.jpg
At least it wasn't boxed by other priceless objects.
20250222_124144.jpg
Backing up hill while breaking open 2 feet of snow was impossible even with tire chains. The loader/blower combination was perfect. Driving uphill into the snowpack, then bragging a pile back with the bucket was the method of choice. The bonus was dragging the pile back far enough to be able to blow the last dragging while dragging a new pile.

Re: Building a bigger toy box.

Posted: Sun Feb 23, 2025 5:47 am
by DavidBarkey
What is the rating of a unit like that ? How much heat does it recover ? I have one in the house , but because the core is plastic it is not as efficient as it could be . Does that have the metal exchanger core ? I want to put one in the shop at some point . Recommendations ? 24'x 32 ' shop .

Re: Building a bigger toy box.

Posted: Mon Feb 24, 2025 7:58 pm
by Spike188
@DavidBarkey The best it will do is a complete turn over of air in 16 minutes on high speed or 32 minutes on low. It does have metal exchanger. It has never been installed but around 15 years old. I picked it up in a plant cleanup and couldn't find a buyer for it. It has been in storage waiting for installation in a toybox. It's time has arrived.
20250224_103859.jpg
It was too windy for starting roof cladding today so we hung the first interior sheet at 10:30 this morning. At 5:30 the 3 of us cleaned up.
20250224_174704.jpg
2 walls are clad and 3 windows trimmed.